IEEE/ICACT20250172 Slide.16        [Big Slide]       [YouTube] Oral Presentation
After running the simulation for 3s, interference is simulated on cluster head node 24. The updating and maintenance process is shown in left figure. The backup cluster head node 3 assumes the role of the new cluster head, taking over the cluster. After the simulation continues for another 5s, interference is simulated on cluster member node 10.The process is shown in right figure. Cluster head node 4 removes the failed node from the member list.

[Go to Next Slide]
Select Voice: